P&H April 2019 - Plans & Results

Planning applications received up to the 3rd April 2019

Ref. no

Application details and address

MDTC response

S19/0369

Applicant: Mr Lee Markey

19 High Street, Market Deeping PE6 8ED

Installation of one internally illuminated barber’s

sign and one non illuminated projecting sign.

App Type: Advertisement Consent.

Object. The property falls

within the Conservation Area

within which internally

illuminated/neon signs are not

permitted. The shop already

has one projecting sign, for

which permission has been

granted. The Town Council

consider a second sign would

clutter the front of the building

and be visually intrusive.

S19/0384

Applicant: Mr Lee Markey

19 High Street, Market Deeping PE6 8ED

Alterations to a Listed Building comprising of the

installation of one internally illuminated barber’s

sign and a non illuminated projecting sign.

App Type: Listed Building Consent

Comments as above.

S19/0521

Applicant: Mr Briggsfish

12 Stamford Road, Market Deeping, PE6 8AB

Fell Yew Tree

App Type: Trees in CA – Section 211 Notice

No objection.

S19/0443

Applicant: Miss Georgina McCrae

Land off Linchfield Road, Deeping St James PE6 8TD

Erection of 77 dwellings (reserved matters pursuant

to S17/2466 – landscaping, layout, appearance and

scale – phase 1)

App Type: Reserved Matters

The landscaping plans show

planting on the definitive legal

route of the east-west public

footpath (DSJ Footpath No 4)

along the site’s northern edge.

This is shown alongside an

unshaded strip described as a

1.5m cycleway. It is unclear

what the intentions are here.

The Town Council wishes to

seek clarification and be

provided with greater detail.

Rather than a 1.5m cycleway,

the Town Council consider that

the existing route of the

footpath should be upgraded

to allow cycling and walking.

Regardless, 1.5m is not

adequate width for any cycle

route. Whilst the location of the Drainage Board’s dyke is

likely to be a consideration, it is

difficult to believe this presents

an insurmountable barrier to

upgrading the footpath on its

definite line. Should it be

impossible then the developer

should seek a diversion to

enable suitable provision for

walking and cycling. It is also

unclear how this 1.5m

cycleway would connect to the

adjacent proposed

development. The Town

Council also are disappointed

that the grass-verge separation

between the carriageway and

footway on Burchnall Close

isn’t continued into the new

development at least as far as

the junction within the site for

consistency.

The design of the litter bins

shown is unlikely to be

adequate. Bins of this design

were installed on the nearby

Market Deepings Persimmon

development but later replaced

due to their size. It would be

desirable to adopt the standard

South Kesteven District Council

bin design that is larger and

provides consistency with the

style elsewhere.

S18/2263

Applicant: BP Oil Uk Ltd

Land adjacent to the A15/A1175 Roundabout,

Peterborough Road, Market Deeping.

Erection of roadside services to include a petrol

filling station with ancillary retail floor

With reference to changes to

the access including the

addition of a deceleration lane

and movement of the

pedestrian crossing to the

roundabout, The Council has

the following comments:

The northbound lane is quite

wide as it comes off the

roundabout. This will make it

more difficult for the pedestrians to cross than at the

location previously shown in

the plans. Could this island be

enlarged or hatching added to

try to reduce the size of the

lane and so make it easier to

cross? A planning condition will

need to be put in place to

ensure that the off-site

changes, including those

mentioned above and the

installation of the dropped

kerbs etc are either carried out

by the developer or funded by

them. The Town Council is

disappointed to note that the

EV charging bays have

disappeared from these new

plans.

 

Planning applications and their results received up to the 3rd April 2019

Ref No.

Application details address

SKDC Decision

S18/2364

Applicant: M Alex McGowan

18 Stamford Rd, Market Deeping

Date Received: 20th December 2018

Decision Date: 8th March 2019

Remedial works to outbuilding including replacement

window.

Approved.

S19/0149

Applicant: Mr Wyatt

58 Church Street, Market Deeping, PE6 8AL

Decision Date: 19th March 2019

Crown reduce Ash tree by 2-3m

Approved.

S19/0299

Applicant: Mr Stephen Leggott

53 Church Street, Market Deeping, PE6 8AN

Date Received: 14th February 2019

Decision Date: 20th March 2019

Non material amendment to Planning Approval

S18/0801 to reduce the size of the carport, reduce its

roof pitch and alter its orientation in the site.

Approved.

S19/0380

Applicant: Mr O Jenkins

5 Duke Meadows, Market Deeping PE6

Date Received: 25th February 2019

Decision Date: 25th March 2019

Proposed larger rear extension

App Type: Householder Prior Approval Application

Refused.

S17/2201

Applicant: Mr Richard Swinscoe

2 High Street, Market Deeping, PE6 8EB

Date Received: 17th August 2018

Decision Date: 29th March 2019

Construction of covered decking areas and timber

cladding of an existing steel storage container to form

a new outside bar and food kiosk.

Approved.

S19/0451

Applicant: Mr Briggsfish

12 Stamford Road, Market Deeping, PE6 8AB

Date Received: 27th February 2019

Decision Date: 2nd April 2019

Felling of Yew Tree

App Type: Trees in CA Section 211 Notice

Approved.

 



 

 

 

 

 

Robert Arnold <intellitechserviceslimited@gmail.com>

14:06 (0 minutes ago)

 

 

to me

 

 

 

 

 

 

 

Notice is hereby given that the next meeting of Market Deeping Town Council’s Planning and Highways Committee will be held on Wednesday 3rd April 2019 at 7.00pm in the Town Hall, Market Deeping, when the following business will be transacted.

 

Agenda

 

1. Chairman’s welcome.

 

2. Apologies for Absence.

 

3. To receive declarations of interest under the Localism Act 2011.

 

4. Minutes from the meeting dated Wednesday 6th March 2019.

 

5. Clerk’s report on matters arising from meeting dated 6th March 2019.

 

6. Correspondence.

 

7. Omega report: Review of performance to date, budget/expenditure/income.

 

Planning

 

8. To consider the planning applications received to date, including SKDC Weekly Planning lists.

 

9. Planning results received.

 

Highways

 

10. For members to receive an update on correspondence regarding the Persimmon Estate and to decide next steps.

 

11. Conservation Area: for members to review any matters in the area.

 

28th March 2019

Mrs Claire Harris